ENQUETE
The civil construction date of the light gauge foil and battery foil project has been preliminarily determined
02.Aug.2022

Recently, Chen Chaowei, secretary of the Party Committee of the Nonferrous Metals Processing Design and Research Institute of CNMC, led the planning team and project management team to Longding Aluminum to conduct technical docking and work coordination on the preparatory work for the construction of the light gauge foil and battery foil projects.
 They discussed and implemented the preliminary conditions of the construction,focusing on the delivery time of drawings, the bidding scheme for construction and schedule. At present, the equipment manufacturer has completed the design of the excavation and load drawing of the rolling mill, the basic condition drawing of the slitting machine, and the basic condition drawing of the annealing furnace, and has delivered the drawings to the planning and design company. The basic conditions of the rolling mill will be finalized from August 10th to 30th. According to the consensus reached through negotiation between the two sides, the civil construction work will meet the bidding conditions on August 30, and will be ready to break the ground on September 14.
Longding Aluminum requires that, on the premise of ensuring controllable investment, controllable risks, and controllable quality, carefully formulate construction engineering plans, coordinate with multiple parties, speed up the progress, and ensure that the project is constructed quickly complying the "four first-class" standards and put into production as soon as possible.